Here’s described the installation of a Quaife ATB Limited Slip Differential QDF6M.
For an even better result in execution and end result, it was especially paid attention to some details.
Here we go:
Start:
First, the axle shafts and the starter were removed:
Then the electrical wires, the gearbox holder, the coupling cable and the connecting screws of engine / gearbox:
The gearbox could then be removed:
The removed gearbox was attached to the gearbox holder:
The removed parts were cleaned and placed aside. The new Quaife Limited Slip Differential is already ready:
The cover of the 5th gear has been removed:
The 5th gear pair and the associated shift fork were removed:
The table fills with parts:
The gearbox housing was removed:
The shafts were expanded. Also the switching parts:
he clutch actuation has been removed:
The removed parts:
The original differential was developed:
All parts were cleaned:
New roller bearings for the secondary shaft were mounted:
The new bearing ring for the secondary shaft was mounted:
The new bearing ring for the secondary shaft was mounted:
New roller bearings for the primary shaft:
The new roller bearing for the primary shaft was mounted:
The crown wheel had to be pressed from the original differential and pressed onto the Quaife ATB Limited Slip Differential:
The crown wheel is now pressed onto the Quaife ATB Limited Slip Differential:
Detail view:
The tacho drive was installed:
The transmission housings were glass-blasted:
A new roller bearing for the secondary shaft was pressed into the gear housing:
The roller bearing was pressed in:
Detail view:
The new bearing shell for the primary shaft was pressed into the gearbox housing:
The bearing shell was pressed in:
New roller bearing for the Quaife ATB Limited Slip Differentiall:
The bearing shell of the differential bearing was pressed in:
Detail view:
The roller bearing was pressed onto the Quaife ATB Limited Slip Differential:
The roller bearing was pressed on:
New roller bearings for the transmission housing for the primary and secondary shaft:
The bearing shells were pressed into the gear housing:
The bearing shells were pressed in:
Detail view:
New bearings for the shift actuator:
Installation Quaife ATB Limited Slip Differential QDF6M
Modérateur : Tissila2
- arno samimi
- Messages : 155
- Inscription : lun. 6 juil. 2009 11:58
- Localisation : CH-4102 Binningen
- arno samimi
- Messages : 155
- Inscription : lun. 6 juil. 2009 11:58
- Localisation : CH-4102 Binningen
Re: Installation Quaife ATB Limited Slip Differential QDF6M
The bearings of the shift actuator were pressed in:
The bearings of the shift actuator were pressed in:
Detail view:
A new shaft seal for the shift actuator has been mounted:
The shift actuator has been mounted:
The assembled shift actuator:
The oil pipe and the vent pipe were mounted:
First, the primary shaft was mounted:
The primary shaft play was checked and set. The same applies to the secondary shaft:
The primary and secondary shafts were removed and the Quaife ATB Limited Slip Differential installed:
On the other side, the Quaife ATB Limited Slip Differential and the second differential bearing were screwed:
The bearing preload was tested and adjusted:
The secondary shaft and the associated shift actuator were mounted first:
This was followed by the primary shaft with the corresponding switch actuator:
This was followed by the reverse gear shaft:
Subsequently, the actuator of the reverse gear was mounted and the sealing compound applied:
The shift controler were deployed and secured before the gearbox was put on:
The housing was mounted:
The housing was screwed:
The shift actuator was threaded and the switch controler locked:
The 5th gear pair was mounted:
The 5th gear shifter and the rubber seal of the cover have been installed:
The cover of the 5th gear was mounted:
The shift actuator has been set:
The lock of the shift actuator was screwed:
The spring of the shift actuator has been inserted:
The rubber muffs of the shift actuator have been installed:
The shaft seals were installed:
The clutch actuator has been installed:
The engine speed sensor, the gearbox vent and reverse switch were installed:
At the same time, a new clutch was installed:
And mounted:
The gearbox was attached again to the engine:
The gearbox was screwed on, the starter and the electrical cables were mounted:
From above everything was screwed on again:
From below also:
In addition, a new Cup exhaust system was installed. Finished:
Don’t forget to fill the Quaife lifetime warranty card, and send it to Quaife:
The bearings of the shift actuator were pressed in:
Detail view:
A new shaft seal for the shift actuator has been mounted:
The shift actuator has been mounted:
The assembled shift actuator:
The oil pipe and the vent pipe were mounted:
First, the primary shaft was mounted:
The primary shaft play was checked and set. The same applies to the secondary shaft:
The primary and secondary shafts were removed and the Quaife ATB Limited Slip Differential installed:
On the other side, the Quaife ATB Limited Slip Differential and the second differential bearing were screwed:
The bearing preload was tested and adjusted:
The secondary shaft and the associated shift actuator were mounted first:
This was followed by the primary shaft with the corresponding switch actuator:
This was followed by the reverse gear shaft:
Subsequently, the actuator of the reverse gear was mounted and the sealing compound applied:
The shift controler were deployed and secured before the gearbox was put on:
The housing was mounted:
The housing was screwed:
The shift actuator was threaded and the switch controler locked:
The 5th gear pair was mounted:
The 5th gear shifter and the rubber seal of the cover have been installed:
The cover of the 5th gear was mounted:
The shift actuator has been set:
The lock of the shift actuator was screwed:
The spring of the shift actuator has been inserted:
The rubber muffs of the shift actuator have been installed:
The shaft seals were installed:
The clutch actuator has been installed:
The engine speed sensor, the gearbox vent and reverse switch were installed:
At the same time, a new clutch was installed:
And mounted:
The gearbox was attached again to the engine:
The gearbox was screwed on, the starter and the electrical cables were mounted:
From above everything was screwed on again:
From below also:
In addition, a new Cup exhaust system was installed. Finished:
Don’t forget to fill the Quaife lifetime warranty card, and send it to Quaife: